GAS AGENCY MANAGEMENT SYSTEM PROJECT DOCUMENTATION

PROJECT SOURCE CODE

GAS AGENCY MANAGEMENT SYSTEM PROJECT SOURCE CODE

PROJECT REPORT

SPONSORED LINKS

GAS AGENCY MANAGEMENT SYSTEM PROJECT REPORT

GAS AGENCY MANAGEMENT SYSTEM PROJECT PPT

OTHER FILES

GAS AGENCY MANAGEMENT SYSTEM PROJECT SOURCE CODE

GAS AGENCY MANAGEMENT SYSTEM PROJECT DATABASE FILES

FREE DOWNLOAD ALL THE PROJECT REPORTS WITH SOURCE CODE FROM HERE

OTHER PROJECTS YOU SHOULD REVIEW

COURSE MANAGEMENT SYSTEMS PROJECT

KNOWLEDGE OUTSOURCING SYSTEM PROJECT REPORT

This page contains Gas Agency Management System Project Synopsis. The project entitled “Gas Agency Management System” is done to make the manual process. Feasibility is the determination of whether or not a project is worth doing the process followed making this determination is called feasibility study. This of determines if a project can and should be taken. Once it has been determined that a project is feasible, the analyst can go ahead and prepare the project specification which finalizes project requirements. Generally, feasibility studies are undertaken within right time constraints and normally culminate in a written and oral feasibility report. Online Gas Agency Management System is a web base project For gas booking they have to make a call to distributor and book the gas. In this project all Data. The contents and recommendations of such a study will be used as a sound basis for deciding whether to proceed, postpone or cancel the project. Thus, since the feasibility study may lead to the commitment of large resources, it becomes necessary that it should be conducted competently and that no fundamental and that no fundamental errors of judgment are made.

There are following types of inter-related feasibility. The are:

i) Technical feasibility

ii) Operational feasibility

iii) Economic feasibility

iv) Social feasibility

v) Management feasibility

vi) Legal feasibility

vii) Time feasibility

Technical feasibility:

Gas agency management system project is a software application designed for This software provides report generation system though which gas agency can analyze. This is concerned with specifying equipment and software and hardware that will successfully satisfy the user requirement. The technical needs off the system may vary considerably, but might include:

· The facility to produce output in a given time.

· Response time under certain conditions.

· Ability to process a certain volume of transaction at a particular speed.

· Facility to communicate data to distant location.

In examining technical feasibility, configuration of the system is given more importance than the actual make of hardware. The configuration should give the complete picture about the system requirements. What speeds of input and output should be achieved at particular quality of printing.

According to the definition of technical feasibility the compatibility between front-end and back-end is very important. Main aim of Gas Agency Management System project is to create a computerized system for billing and maintaining Student Project Reports. Project Report; Project. In our project the compatibility of both is very good. The degree of compatibility of Visual Basic 6.0. and Oracle 9i is very good. The speed of out put is very good when we enter the data and click button then the response time is very fast and give result very quickset. I never find difficulty when we use complex query or heavy transaction. The speed of transaction is always smooth and constant. This software provides facility to communicate data to distant location.

We use Visual Basic 6.0. The designing of front-end of any project is very important so we select Visual Basic 6.0 as front-end due to following reason:

· Easy implementation of code.

· Well define interface with database.

· Well define hand shaking of oracle 9i.

· Easy debugging.

At present scenario the no of backend are available but I have selected oracle 9i because of the following number of reasons.

· Able to handle large data.

· Security.

· Robust RDBMS.

· Backup & recovery.

GAS AGENCY MANAGEMENT. SYNOPSIS The project entitled “Gas Agency” is done to make the manual process The report design of this system includes With the help of above support we remove defect of existing software. In future we can easily switch over any plate form. To ensure that system does not halt in case of undesired situation or events. Problem effected of any module does not effect any module of the system. A change of hardware does not produce problem.

PROJECT SOURCE CODE

GAS AGENCY MANAGEMENT SYSTEM PROJECT SOURCE CODE

GAS AGENCY MANAGEMENT SYSTEM PROJECT DATABASE FILES