Bank Management System Project report

EVOLUTION OF Bank Management System Project Report in Java: The Online Bank Management System services are well known as distance banking services

PROJECT SOURCE CODE

ONLINE BANK MANAGEMENT SYSTEM PROJECT SOURCE CODE

DataBase ONLINE BANK MANAGEMENT SYSTEM PROJECT

PROJECT REPORT

SPONSORED LINKS

DESIGNING OF SYSTEM- Bank Management System Project

The design of the information system produce the detail that state how a system will meet the requirement identified during system analysis often refer to this stage as logical design,The Top Management project-report-banking-management-system in vb technology discussion Bank Management System model report.doc in contrast to the process of developing program software, which is referred to as physical design.

System analysts being the process by identifying reports, the requirement and output need by the system. Then the specific data on each are pinpointed. Usually, designers sketch the form or displays they expect from the system. This can also be done on a paper or on the computer display with the help of automated system tools available.

in this project, "Bank Management System" has been designed to computerized the following functions • Total balance in Bank • Individual Customer Report for bank management system. This project is to add it to any project list. The system design also describes the date to be input, calculated, or stored. Individual date items and calculation procedures are written in detail. The procedures tell how to process the data and produce the output.

BCA PROJECT ON Bank Management System

Project Designers are responsible for providing programmers with complete and clearly outlined software specification. ,bank management system project. As programming starts, designers are able to answer questions, clarify fuzzy areas, and handle problems that confront the programmers when using the design specifications.

As the software is to be designed in JAVA 1.3 and back-end ORACLE 8I.0, the concept of database is must for quantity designing. It will be designed of the database, designing of forms, designing of reports.

Unlikely the existing system, separate table have been created for specific details. In order to make the response time negligible; all the tables have been created in the memory file system (MFS). Moreover, indexes have been created on the tables in which the number of records is very large. PROJECT REPORT ON BANKING MANAGEMENT SYSTEM TABLE OF CONTENTS Abstract of the Project System Requirements Product Definition Feasibility Analysis Therefore, in the proposed system, search for a value has been made direct. This is contrast to the sequential search being done in the existing system have been taken care of in the system.

Design objectives:

The following goals were kept in mind while designing the new system:

i) To reduce the manual works required to be done in the existing system.

ii) To avoid errors inherent in the manual works and hence make the output consistent and correct.

iii) To improve the management of permanent information of the hotel by keeping it is properly structured tables and to provide facilities to update this information as efficient as possible.

iv) To make the system complete menu-driven and hence user-friendly. This is necessary so that even non-programmers could use the system effectively and system could act as catalyst in achieving objective.

v) To make the systems compatibility i.e. it should “fit in” in the total, integrated system BANKING MANAGEMENT SYSTEM full report, Ask Latest the software for bank management has become report on bank management system, project report .

vi) To design the system in such a way that reduces feature maintenance and enhancement times and efforts.

vii) To make the system reliable, understandable and cost effective.

Design overview:

The design stage takes the final specification of the system from analysis and finds the best way of fulfilling them, give the technical environment and previous decision on required level of automation.

The system design is carried out in two phase:

i) Architectural design (high level design).

ii) Detailed design (low level design).

High Level Design:

The high-level design maps the business system described in the program requirement specification for logical data structure. It involves:

i) Identifying the entities:

All the entities related to the module were identified, checked and consolidated.

ii) Identifying the relationship :

The relationships between entities, within and outside the system were identified.

iii) Attribute defenatation:

The pertaining to the entities was identified and their field characteristics were specified.

iv) Normalization:

The entities were normalized. After first and second normalization go to Dknf was achieved for all the entities of systems.

v) Interface:

Interfacing with other system was done and attributes related to external entities were identified.

Once the entities and their attributes were defined, entity relationship diagrams.

Low Level Design:

The low-level design maps the logical; model; have the system to a physical database design:

Default database design:

This utility create column and constraint definitions form the entity model and the table / entity mapping entered in CASE* dictionary. This database design can be refined according to your application regarding using can be refined according to your application regarding using the tables, columns sand key constraint definition screen to make amendments.

The step involved here were:

i) Generation of table.

ii) Check constraint.

iii) Primary key.

iv) Unique key.

v) Foreign key.

Module design:

This screen is used to enter module information during the design stage of business system development. The application systems, function, tables and columns must already exist in CASE* dictionary before being referenced.

User preferences:

Based on user preference like form name, validation of primary key, layout of forms, layout of fields. Creating title for forms, mandatory input field prompts etc. was incorporated here.

Generate the program:

The program was generated based on the relationship specified and according to the user preferences.

Program specification: Bank Management System Project

The program specifications were written for the master, transaction, report, and queries. The logic for each fields, from were so that anyone who does not know system will be able to code the logic. Field validations and user-friendly error message were written as a part of the program specification. This is a good final year Computer science engineering project report on "Bank Management system" which is based on the powerful tool – Visual Basic 6.0 (Front. Project on Banking System in Mis, PDF Project Report Banking Management System. REPORT OF ONLINE BANKING SYSTEM.

Identifying common procedure is yet another activity carried out in the LLd stage.

This is done mainly for two reasons:

1) Saving the development time

As the procedures will be common to many programs, the development time be saved substantially by keeping.

2) Testing become easier

As the procedures become an independent entity, it can be easily tested.

DESIGN DECISION: Bank Management System Project IN JAVA

The system has been decided to develop on java using its various products like crystal report and back-end oracle 8i.0.

ORACLE 8I has been chosen since the system has the following requirement and it categorized all:

1. Large database and space management control

JAVA and back-end oracle 8i.0 supports the large amount of database. It stores the data in the form of tables making optimal use of the available storage. To make efficient use of expensive hardware devices, it fulls control of space usage.

2. Many concurrent database users

Front-end JAVA and back-end Oracle 8i.0 support large number of concurrent users existing a variety of database application operating on the same data.

3. High transaction processing performance

Java with back-end Oracle 8i.0 maintains the preceding features with a high degree of overall system performance. Introduction to Bank Management System Project: In the present scenarios, banks play a significant role in handling the wealth of an organization Introduction to Bank Management System Project: In the present scenarios, banks play a significant role in handling the wealth of an organization Database user does not suffer slow processing performance.

4. Controlled availability

Oracle 8i.0 can selectively control the availability of data, at the database level and sub-database level. For example, an administrator can disallow use of a specific application so that applicant’s data can be related, without affecting other application

DEVELOPMENT OF SOFTWARE

Software javas may install (or modify and then install) purchased software or they may write new, custom-designed programs. The choice depends on the cost of each option, the time available to write software, and the available to write software, ands the availability of programmers. Typically, in large organizations computer programmers (or combination of system analyst’s programmers) are part of the permanent professional staff.

In smaller firms, without programmers, outside programming service may be retained on a contractual basis.

Programmers are also responsible for documenting the program, providing an explanation of how and why certain procedures are coded in specific ways. Documentation is essential to test the program and carry on maintenance once the application has been installed.

The standards enforced were in conformance with development statement manual of CLEARK AVADH. 28-04-2009 · BANK MANAGEMENT SYSTEM 2 java Project report online banking system. Management Information Systems in the Banking Sector.Before starting any coding of any subsystem we were required to carefully study the information and requirements regarding that application. Once the problem was well though off, ands ideas were shared/ discussed among other team members about, how exactly the user interface should be and what is the best way to deduce the logic of the application, we are required to write down the flow of logic and other parameters being used or getting affected on a document of CLEARK AVADH called program specifications document (P S D). This P S D has to get approved from, our manager and users to get further suggestions; also this P S D’s are used to prepare the documentation of the final system at later stages and help to keep trace of the changes subsequently made in logic.

The whole application is maintained in the menu from so that it remains user friendly and easy to use and less complex.

The system security is maintained by means of the starting form, which takes the required user name and the password.

The first simply has the function of showing the banner of the material management system. A timer is set which on time loads the login form .

Tools/environment used :

Hardware Requirements:

Processor - Pentium I (min.)

Speed - 2.7GHz (min.)

RAM - 156 MB DDRAM

Hard Disc capacity - 40GB

Monitor - SVGA color monitor

Printer - Dot Matrix / HP Laser Jet

Software Requirements:

Operating System - Windows NT/98/2000

Front End - JAVA 1.3

RDBMS - Oracle 8i.0