Corridor Match Boarding

Not only has the match boarding for the side wall been reinstated, but the lower panels on the door have also been trial fitted. Some of the door framework has had to be removed to allow the match boarding to slot in place. The next set of match boarding can be seen propped against the far wall, ready to be reinstated.