Corridor Frame Cleaned

While I retreat to the safety of Essex, the two stalwarts carry on. Marcus (the owner) and Roy (the hired help) make very good progress on side A framework clean up in preparation for re panelling. This picture shows the corridor side with three bays cleaned up, repaired and one door fitted. However the 2nd door won't be as easy as half the pillar is missing!