Feb 2007 (Pt1)
After almost 4 years of dust and grime, the lower section of the roof gets a quick brush over prior to the prep work for the re-instatement of the cornice that cover the edge of the roof canvas. The white bit is the clean bit!
Each length of cornice (approx 20ft ) had to have pilot hoes every six inches drilled and sunk in preparation for the screws and the plugs. Every 6 inches over the lengths for both sides... and I volunteered for this!!
As each section of cornice went up, the side looked more complete... and then the other side with lots of looking, screwing, fitting etc...