Cornice Preparations

Each 20 foot length has to be prepared before it goes up on the roof. This includes sanding, drilling (every 6 inches) through the wood to take the screws that will secure the cornice to the roof and also drilling a larger recess to take the plugs that will cover the screws. Back breaking boring work.