New Coach Floor

A view down the length of the coach showing the new floor under compartments 2, 3 and floor and also sections of the corridor. At this stage some of the floor-frame knee irons have been repaired/replaced or cleaned up and have had several coats of paint and a final coat of bitumen for maximum protection.