Corridor Bay 2 and 3 Beading

With Bay 1 complete we cracked on with the next two bays. Before the weekend was out we hoped to at least get the glass in on bay 2. A pre-requ for this was that all the beading was in place. This is a real study in concentration as the production line swings in to action. Odd how I still managed to find time to take a picture. Must have been the thought of those pins.