The homepage tracks chronologically the main events in the project from collection to eventual completion!
The video and pictures below are from the people I bought her from as advertised. She had been polished up to look as good as possible but not all was well underneath.
KNC 913F was registered on 19th April 1968 making it one of the 909 S-Types built in 1968, the last year of manufacture. It has always been British Racing Green with a black ambla (vinyl) interior. It was built with the desirable option of power steering and is 'matching numbers' having its original engine and gearbox. Mr Jeremy Yates who owned the car for 36 years from 1973 until 2009 did a few modifications to make it more reliable and some significant rebuilds which included:
Upgraded brake calipers fitted from an XJ Series 1.
Modifications to the brake vacuum system to avoid loss of vacuum and brake booster/servo failure he experienced on a mk2 Jaguar.
Fitment of a plumbed-in oil pressure gauge (due to inaccuracy of the reading and sender from the original Smiths gauge).
Fitment of chrome wire wheels
Fitment of a Webasto roof
Complete engine and gearbox rebuild in 1995 at 76,333 miles costing £4500. The engine and gearbox do not leak and run well now at just under 94,000 miles
Significant rust repair and respray in 2004 costing £4679.97.
A more detailed breakdown of the history of the car is in the History page.
Before...
After...
On the trailer again with some help from my friends
In her new home
Before...
During rebuild...
November-December 2018
Before...
After...
Before..
..more before..
After..
The areas that need most preparation are where I've put new metal in. There were slight differences between the front wheel arches too that required one to be pulled out slightly. It all looks a mess but my friend Barry who used to work in the trade we're making good progress.
See the exterior bodywork page for more.
I've been replacing the door bottoms and cleaning and refurbishing the window regulator mechanisms and cleaning the chromework.
By autumn 2019 the exterior has had a lot of work and now has a coat of high build 2 pack primer. The basecoat and lacquer will follow in Spring 2020
Websato roof ready to disassemble
Door card refurbishment
Left - centre console clean and refurbishment. Above, interior cleaning and sound deadening.